Sun River Electric logo


Billing Rates & Fees

Irrigation

 

I - 08 - IRRIGATION
SUN RIVER ELECTRIC COOPERATIVE, INC.
EFFECTIVE FOR 2008 IRRIGATION SEASON

 

TYPE OF SERVICE:

            Single phase or three phase, 60 cycles, at available secondary voltage.

AVAILABILITY:

            Available to all members, upon application, where the cooperative's line facilities are adequate, or can feasibly be made adequate, for irrigation pumping.  Sun River Electric's season is considered to extend from April 20th to October 10th.

RATE OPTIONS:


HISTORICAL IRRIGATION RATE:

Three Phase   Single Phase
Energized Base Rates:   $288.00/season   $216.00/season

HP Charge:  
$19/nameplate HP/season for all HP over 15 for three phase and
                             all HP over 11 for single phase

Kwhr Billing:   550 - No Charge  300 - No Charge
Next 525 kwhr/HP  $.0720/kwhr $.0720/kwhr
All other kwhrs $.0700/kwhr $.0700/kwhr

Note:  Drive motors will be assessed based upon 1/4 HP/season/tower

MINIMUM CHARGE FOR 2008 IRRIGATION:

            The horsepower charge will be $19.00 per year per nameplate horsepower of connected load.  In no event will the minimum charge be less than $216.00 plus the nameplate horsepower of connected load for single phase service and $288.00 plus the nameplate horsepower of connected load for three phase service. 

METHOD OF PAYMENT:

            Minimums must be paid in advance of irrigating with the following exception:  If the member wishes he/she may furnish the cooperative with an irrevocable letter of credit payable to the cooperative on demand at the end of the irrigation season.


2008 BUDGET IRRIGATION RATE:      

Three Phase   Single Phase
Energized Base Rates:   $288.00/season   $216.00/season

HP Charge:  
$19/nameplate HP/season for all HP over 15 for three phase and
                             all HP over 11 for single phase

Kwhr Billing:   550 - No Charge 300 - No Charge
Next 525 kwhr/HP $.0720/kwhr $.0720/kwhr
All other kwhrs $.0700/kwhr $.0700/kwhr

Note:  Drive motors will be assessed based upon 1/4 HP/season/tower

MINIMUM CHARGE FOR 2008 BUDGET IRRIGATION:

            The annual minimum will be the base rate plus the horsepower charge.

            The horsepower charge will be $19.00 per year per nameplate horsepower of connected load.  In no event will the minimum charge be less than $216.00 plus the nameplate horsepower of connected load for single phase service and $288.00 plus the nameplate horsepower of connected load for three phase service.

METHOD OF PAYMENT:

            Minimums must be paid in six equal monthly payments beginning in April; all overages are due and payable in November.  In the event that the annual minimum has not been used the amount paid, less usage above $288.00 will be subject to refund, transfer or applied to subsequent year's contract, at member's option.  If the member does not express preference, the credit will be held over to the following year's contract.

 


2008 ELECTRONICALLY-READ IRRIGATION RATE: 

Three Phase   Single Phase
Energized Base Rates:   $300.00/season $228.00/season

Kwhr Billing:  
All other kwhrs  

 

400 - No Charge
$0.0690/kwhr
250 - No Charge
$0.0690/kwhr

AVAILABILITY:

            Because this tariff requires that Sun River Electric install additional equipment, enrollment may be limited.  

MINIMUM CHARGE:

            All energy billed monthly during the irrigation season according to usage.

METHOD OF PAYMENT:

            Readings  will be received electronically each month with statements generated and mailed on the last working day of each month.  Payments will be due upon receipt of statement and past due after the 10th of that month.

IRRIGATION METERING:

            All irrigation accounts will be metered on a non-demand basis.

POWER FACTOR ADJUSTMENT:

 The consumer agrees to maintain unity power factor as nearly as practicable.  At the option of the cooperative the power factor and KW demand of the consumer shall be measured and the monthly bills adjusted.  Such adjustment shall be made by increasing the bills by 1% of each 1% by which the average power factor is less than 95% lagging.  At the request of the cooperative the consumer agrees to apply corrective measures to his load to bring the average power factor to 95% lagging, or higher.


2008 SELF-READ IRRIGATION RATE:           

Three Phase   Single Phase
Energized Base Rates:   $438.00/season   $366.00/season 

Kwhr Billing:   550 - No Charge  300 - No Charge
Next 525 kwhr/HP $.0720/kwhr $.0720/kwhr
All other kwhrs

 

$.0700/kwhr $.0700/kwhr

MINIMUM CHARGE FOR SELF-READ I-08:

            The annual minimum will be the base rate.

           METHOD OF PAYMENT:

            The base rate must accompany the signed contract and received in the office by April 20th.  Subsequent months billed according to usage and are subject to normal billing policy.

READING REQUIREMENTS:

            Readings must be taken and submitted to Sun River Electric office between the 15th and 20th day of irrigation season months of May, June, July, August, September and October to qualify for monthly discounts of $25.00.  If meter is not read, account will be estimated and billed on the estimation without a $25.00 discount.  Or, at the option of Sun River Electric, the meters will be read and accounts billed without receiving the $25.00 discount.

 

 

Home ] Home ] History ] Ripples Newsletter ] Community Service ] Military_Appreciation ] Programs ] Emergency Numbers ] Call Before You Dig ] Cooperative Principles ] Trustees ] Employees ] Jobs ] Safety ] Apply for Service ] Billing Rates ] Capital Credits ] Scholarships ] Customer Owned Generation ] Other Links ] Email ]