Billing Rates & Fees

Residential Green Energy


SCHEDULE A 08 -
RESIDENTIAL GREEN ENERGY
SUN RIVER ELECTRIC COOPERATIVE, INC.

EFFECTIVE JANUARY 15, 2008

TYPE OF SERVICE:

             Single phase, 60 cycles, at available secondary voltage.

AVAILABILITY:

             To all members requiring single phase service for a period of more than six (6) months each year and at less than 50 KVA capacity, subject to other rules and regulations of the cooperative.  The total capacity of any single phase motor under this schedule shall not exceed 10 HP without written permission of the Cooperative.

            This rate is not available for seasonal or stock well services.  Members requiring single phase service with capacities exceeding 50 KVA shall be served under the GS Rate Schedule.

            This rate is for those residential members who have chosen to enroll in the "Green Energy" program and who have signed a "Green Energy" Purchase Agreement.

MONTHLY RATES:

                        Base Minimum                          $22.00/month
                       
All kwhrs                                    0.07609/kwhr

MINIMUM CHARGE:

            The minimum monthly charge under the above rate schedule shall be $22.00 per month where 10 KVA for overhead and 15 KVA for underground or less of transformer capacity is required.  For consumers requiring more than 10 KVA for overhead and 15 KVA for underground of transformer capacity, the minimum monthly charge shall be increased by $1.00 per KVA or fraction thereof required for the additional KVA. 

POWER FACTOR ADJUSTMENT:

The consumer agrees to maintain unity power factor as nearly as practicable.  At the option of the cooperative the power factor and KW demand of the consumer shall be measured and the monthly bills adjusted.  Such adjustment shall be made by increasing the bills by 1% of each 1% by which the average power factor is less than 95% lagging.  At the request of the cooperative the consumer agrees to apply corrective measures to his load to bring the average power factor to 95% lagging, or higher.

 

Home ] Home ] History ] Ripples Newsletter ] Community Service ] Military_Appreciation ] Programs ] Emergency Numbers ] Call Before You Dig ] Cooperative Principles ] Trustees ] Employees ] Jobs ] Safety ] Apply for Service ] Billing Rates ] Capital Credits ] Scholarships ] Customer Owned Generation ] Other Links ] Email ]